Wild Goose is located north of Sacramento in northern California and was the first independent storage facility built in the state. The facility commenced full commercial operations in April 1999 and in April 2004 completed its first expansion. Customers have direct access to Pacific Gas and Electric’s (PG&E) backbone system.
Total gas storage and deliverability capacity at Wild Goose currently is as follows:
| Working Gas Capacity: | 50.0 Bcf |
| Peak Withdrawal Rate | 700 mmcf/d |
| Peak Injection Rate | 450 mmcf/d |
Key Features
Natural Gas Pipeline Maps - Wild Goose area (PDF, 106 KB), North America (PDF, 216 KB)
Site designed and developed by PITCH